fbpx

Emergency Flood Rectification | Parramatta Council

stay updated with latest news

The Parramatta Council, recently requested the assistance of Dynamic Hydro Excavations Sydney, to swiftly remove water from a blocked drain, which accrued during a period of torrential rain.

Blocking access to 5 businesses, the job was urgent and required six trucks. Just over four loads from each truck were taken from the site, which came close to 300,000L.

After the flooding situation was rectified, our jetter combo unit cleaned the drain to prevent the situation from occurring again in the future.

In a quick review, overall the client was extremely happy and impressed with the turnaround time and manner in which the team worked collaboratively with other contractors, to get the job done.

For more information about our involvement with this project visit: www.dynamicexcavations.com.au or call Warren Barber on 0418 757 711 or Peter Gialouris 0431 071 476

Like this article?

Share on Facebook
Share on Twitter
Share on Linkdin
Share on Pinterest

Leave a comment

Call Now Button